Valley Metro’s South Central Light Rail Extension will enhance mobility throughout downtown Phoenix, connecting riders to South Phoenix, university campuses, and Phoenix Sky Harbor International Airport. The 5.5-mile extension includes an expansion of the light rail system’s operations and maintenance center.
Supporting PGH Wong Engineering, Burns provided a variety of systems design services:
Construction of the South Central Light Rail Extension is scheduled to complete by 2024. Burns is providing construction services including permitting, special inspections, and general oversight.
Previous facility improvement projects for rail and transit system clients include a redesign of the Port Authority Transit Corporation Lindenwold Shop and Office as well as multiple facility design and construction services for Amtrak.
Image courtesy of Tony Webster.
Location
Phoenix, AZ
Client
Valley Metro
Industry
Washington Metro Area Transit Authority (WMATA) Yellow Line, Steel Liner and Bridge Structure Repair Design/Engineering Services
SEPTA, 5th Street Station Rehabilitation
Southeastern Pennsylvania Transportation Authority (SEPTA) Elwyn to Wawa Service Restoration
Washington Metropolitan Area Transit Authority (WMATA) Potomac Yard Metrorail Station