The Mid-Coast Trolley project extended San Diego’s light rail network 11 miles from the Santa Fe Depot in Downtown San Diego to University City, adding nine stations and connecting major destinations including Old Town, UC San Diego, and Westfield UTC. As an extension of the Metropolitan Transit System Trolley Blue Line, the project created a one-seat ride from the international border to the University area. It also modernized the track between Old Town and the Santa Fe Depot and introduced new rail lines that use raised bridge structures in areas with constrained right of way.
Burns delivered railroad signal design from concept through final design, along with vital and non-vital train control communications design, technical specifications, cost estimates, CMGC negotiations, and feasibility analysis. Drawing on its knowledge of the construction market, Burns recommended migrating from the Sicas S7 platform to the widely used ElectrologIXS platform to improve long-term support and increase competition. That forward-looking recommendation helped the project avoid installing legacy equipment when Siemens later designated the Sicas S7 as end of life.
Throughout design, Burns coordinated closely with the broader project team to define equipment and enclosure needs, review civil plans, and maintain required clearances for overhead catenary poles, drainage, structural elements, and other civil features. Burns also coordinated with utilities and station designers to establish communications at station locations and designed the interface with the existing fiber optic network, enabling information to reach the 12th and Imperial Operations Control Center.
Location
San Diego, CA
Client
San Diego Association of Governments
Industry
Expertise